News

1a Charla Tecnica – Principios de Geomecanica aplicada a los procesos de construcción de pozos

IESL was completed a completion design assessment work for an operator in Southern Australia. The work included the use of existing engineering data to validate geomechanical models that allowed the user to select the optimum completion design for the fields.

READ MORE

Completion Design Assessment

IESL was completed a completion design assessment work for an operator in Southern Australia. The work included the use of existing engineering data to validate geomechanical models that allowed the user to select the optimum completion design for the fields.

READ MORE

Risk of asphaltene deposition and near wellbore formation damage contract

IESL was awarded work for a Norwegian operator needing to determine the risk of asphaltene deposition and near wellbore formation damage.

READ MORE

Successfull completion geomechanical work for the Gulf of Guinea

IESL has successfully completed geomechanical work for the Gulf of Guinea. An operator required an assessment of the field geomechanical and expected production conditions in the area and whether sanding will be induced.

READ MORE

Solutions to dramatic changes in our industry

In a ever changing industry, we at IESL have seen significant upheaval in our time. These changes have required rapid and effective response and solutions to continue providing our clients with the same level of outstanding service that is expected from us.

READ MORE
[trx_twitter count="3"]
Instructions
close slider

Strata Mecanica logoInstructions for Graph Production


Step 1: Project Details

Enter the details for you project for easy identification.

Step 2: Units of Measurement

Select Imperial or Metric and ensure you enter ALL data in that unit of measurement

Step 3: Data Entry

Enter the data for each Formation

Step 4: Summit your entries

 

Submit your entries for graph calculation and press "Go Back" to re-enter any values