UKCS Oil Production and Injection Prediction

Engineering Computations - Oil Production and Injection Prediction – UKCS ONLY
Step 1 of 2

This process will allow the user to do calculate the following:

On the oil, gas and water production side 1. Predict as a function of field’s life (years) expected oil production profiles 2. Estimation of Cessation of Production CoP 3. Water production profiles can also be estimated 4. Gas production profiles can be predicted On the water injection side (For non-fractured reservoirs) 1. Injectivity index prediction 2. Maximum injection pressure (IBHP) 3. Estimated surface injection pressure 4. Required surface horsepower

Data Input Section

Enter the name for this Project
Details of the Project
Person Responsible for the Project
Select the Geographical Region
Enter the Field / Block number for this project
Select whether you require Oil Injection or Water Injection predictions.
Instructions
close slider

Strata Mecanica logoInstructions for Graph Production


Step 1: Project Details

Enter the details for you project for easy identification.

Step 2: Units of Measurement

Select Imperial or Metric and ensure you enter ALL data in that unit of measurement

Step 3: Data Entry

Enter the data for each Formation

Step 4: Summit your entries

 

Submit your entries for graph calculation and press "Go Back" to re-enter any values